Basit öğe kaydını göster

dc.contributor.authorBikçe, Murat
dc.contributor.authorGöçer, Süleyman
dc.date.accessioned2020-05-24T13:57:02Z
dc.date.available2020-05-24T13:57:02Z
dc.date.issued2018
dc.identifier.citationBikçe, M., Göçer, S. (2018). An approach to preparing a bill of quantities. International Advanced Researches and Engineering Journal, 2(3), 229-233.
dc.identifier.issn2618-575X
dc.identifier.issn2618-575X
dc.identifier.urihttp://www.trdizin.gov.tr/publication/paper/detail/TXpNMk5qa3dNQT09
dc.identifier.urihttps://hdl.handle.net/20.500.12508/1015
dc.description.abstractAt the pre-design stage, it is essential for designers and property owners to have a rough idearegarding the material quantities necessary for construction as well as the building cost. To knowthese approximate values is of great importance in terms of the correct establishment of thefinancial model at the pre-design stage, the elimination of cash flow problems and the preventionof loss of national wealth. While calculating these values, approximate unit costs announced bythe Ministry of Public Works and Settlement are used. In Turkey, the cost estimate at the predesign stage is obtained by multiplying the total building construction area by the unit constructioncost. However, it is generally accepted that this value is high in terms of free market costs. Thepurpose of this study is to prepare a program that can calculate approximate construction cost withunit workmanship prices in a specific region and approximate quantities including the minimumand maximum values of the material values by entering simple information about a planned RCbuilding. Accurate cost estimation at the pre-design stage is proportional to the accuracy of thematerial metering ratios. The coefficients taken into account in this study have been checked andcalibrated with a large number of projects, and it was observed that the samples containing thepreliminary results of the study were compatible with the application project results.en_US
dc.language.isoengen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectBilgisayar Bilimlerien_US
dc.subjectBill of quantityen_US
dc.subjectConstruction costen_US
dc.subjectProgramen_US
dc.titleAn approach to preparing a bill of quantitiesen_US
dc.typearticleen_US
dc.relation.journalInternational Advanced Researches and Engineering Journalen_US
dc.contributor.departmentMühendislik ve Doğa Bilimleri Fakültesi -- İnşaat Mühendisliği Bölümüen_US
dc.identifier.volume2en_US
dc.identifier.issue3en_US
dc.identifier.startpage229en_US
dc.identifier.endpage233en_US
dc.relation.publicationcategoryMakale - Ulusal Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.contributor.isteauthorBikçe, Muraten_US
dc.contributor.isteauthorGöçer, Süleymanen_US
dc.relation.indexTR-Dizinen_US


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster