Basit öğe kaydını göster

dc.contributor.advisorErdiş, Ercan
dc.contributor.authorBulut, Özgür Menderes
dc.date.accessioned2021-12-23T16:52:13Z
dc.date.available2021-12-23T16:52:13Z
dc.date.issued2021en_US
dc.date.submitted2021
dc.identifier.citationBulut, O. M. (2021). Kamuya ait okul inşaatlarındaki revizyonların süre ve maliyete etkisi. (Yüksek Lisans Tezi). İskenderun Teknik Üniversitesi / Mühendislik ve Fen Bilimleri Enstitüsü, Hatay.en_US
dc.identifier.urihttps://hdl.handle.net/20.500.12508/1955
dc.description.abstractKamu inşaat işleri 2002 yılında 4734 sayılı Kamu İhale Kanunu'nun kabulünden sonra, çok daha verimli ve etkili şekilde işlemektedir. Ancak buna rağmen pek çok projede tasarım ve yapım kaynaklı süre ve maliyet artışlarının yaşandığı bilinmektedir. Sahada projenin süre ve maliyet artışına uğramasına sebep olan birçok etken bulunmaktadır. Bu çalışmada 2015 ile 2019 yılları arasını kapsayan dönemde yapımı tamamlanmış 85 kamu okul inşaatı projesine ait tasarım ve uygulama aşamasında gerçekleştirilen 141 adet revizyon, revizyon onay belgeleri vasıtasıyla incelenmiş ve revizyonların ana ve alt sebepleri belirlenmiştir. Kamu okul inşaatı yapılarının tasarım ve uygulama aşamalarında meydana gelen revizyonlar, süreçte rol alan tüm mühendislik ve mimarlık dalları dikkate alınarak tasnif edilmiştir. Çalışmada; fizibilite, mimari, statik, mekanik ve elektrik projelerinde tasarım ve uygulama kaynaklı revizyonların yaşandığı ve bunun projelerde süre ve maliyet artışlarına neden olduğu vurgulanmıştır. Her branşın sebep olduğu süre ve maliyet artışları analiz edilerek alt sebeplerin yaşanma sıklığı ve proje maliyeti ve süresi üzerindeki etkisi incelenmiştir. Ayrıca revizyona neden olan ana ve alt sebeplerle ilgili olarak çalışmada, çoğunluğunu kamuda çalışan mühendis ve mimarların oluşturduğu teknik elemanlarla bir anket çalışması gerçekleştirilmiştir. Böylelikle revizyon onay belgelerinden elde edilen proje revizyonlarının sebepleri ile ilgili sonuçların detaylandırılması ve ilişkilerin kurulması amaçlanmıştır. Çalışmanın sonunda revizyonların sebepleri dikkate alınarak önlenmesi için çözüm önerilerine yer verilmiştir.en_US
dc.description.abstractPublic construction works run much more efficiently and effectively after the adoption of the Public Procurement Law No. 4734 in 2002. However, it is known that time and cost overruns are encountered in many projects based on design and construction. There are many factors in the field that cause time and cost overruns. In this study, a total of 141 change orders made during the design and construction phase of 85 public school construction projects, the construction of which was completed in the period between 2015 and 2019, were examined through change orders approval certificates, and the main and sub-reasons of the revisions were determined. The revisions that occur during the design and construction phases have been classified according to all the engineering and architecture branches involved in the process. It was emphasized that there have been revisions resulting from the feasibility, architectural, static, mechanical and electrical designs, and these lead time and cost overruns in the projects. The duration and cost increases caused by each branch were analyzed, and the frequency of the sub-causes and the impact on the project cost and duration were examined. In addition, a survey was conducted with the technical staff, most of whom were engineers-architects working in the public sector, in the study regarding the main and sub-causes causing the revision. In this way, it was aimed to elaborate the results related to the reasons for the project revisions obtained from the change orders approval certificates and to establish relations. At the end of the study, suggestions for solutions are also included to prevent revisions.en_US
dc.language.isoturen_US
dc.publisherİskenderun Teknik Üniversitesi / Mühendislik ve Fen Bilimleri Enstitüsü / İnşaat Mühendisliği Ana Bilim Dalıen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectSüre ve maliyet artışlarıen_US
dc.subjectRevizyonlaren_US
dc.subjectDeğişiklik emrien_US
dc.subjectTime and cost increasesen_US
dc.subjectRevisionsen_US
dc.subjectChange ordersen_US
dc.titleKamuya ait okul inşaatlarındaki revizyonların süre ve maliyete etkisien_US
dc.title.alternativeEffects on duration and cost of change orders in public school construction projectsen_US
dc.typemasterThesisen_US
dc.contributor.departmentMühendislik ve Fen Bilimleri Enstitüsüen_US
dc.contributor.authorID0000-0003-2180-4182en_US
dc.relation.publicationcategoryTezen_US
dc.contributor.isteauthorErdiş, Ercan
dc.relation.indexİndeks Bilgisi Yoken_US


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster